All trade Revit models were created after complete the basic design documentary, BIM uses were selected for check the consistency of each discipline and among all disciplines.
Output data was detected many mistakes of drawings. The most dangerous design mistake is in the basement where clearance issues between structure beams and architecture circulation shown very low distance.
This result advanced in involved engineer teams’ mind on exchanging to use BIM software into design process and adjust the current design procedure.